Network Charges

See below for the charges applied by network for siteworks. Other charges may apply and are available upon request.

Electricity:

No Type of Additional Service Charge (€) (Excl VAT) Charge (€) (Incl VAT)
1 Visit to energise the connection point:
For each visit to the premises at the suppliers request to energise the connection point.
70 79.45
2 Visit to de-energise: not actioned
For each visit to the premises at the suppliers request and the request is not actioned through no fault of DSO ( cases specified in the Networks Code of Practice)
70 79.45
3 Visit to de-energise:
For each visit to the premisie at the Suppliers request for any reason, resulting in de-energisation by withdrawal of fuses.
70 79.45
4 Visit to disconnect:
Where the User requests the disconnection of the site.
161 182.74
5 Visit to Read Meter (Special Read):
Where the Supplier requests an unscheduled meter reading.
66 74.91
6 Major Meter Test:
Visit and carry out major meter test.
241 273.54
7 Check Meter Accuracy 169 191.82
8 Prepaid to Credit Meter 175.44 199.13
Gas:    
1 Meter Fit with new connection 59.84 67.92
2 Reconnection/ Unlock Service Lock 60.69 68.88
3 Prepaid to Credit Meter 175.44 199.13
6 Unlock Meter 63.91 72.54
8 Disconnect Meter 94.73 107.52
9 Meter Test 353.29 400.98

See attached document for Gas siteworks charges